Gunung Raja Paksi (GRP)

43 megawatt-peak (MWp) solar rooftop system Installation

Country: Indonesia

“The installation of solar panels will be carried out throughout the factory area. This effort is a sustainable and long-term advantage which further strengthens GRP’s commitment towards mitigating greenhouse gas emissions. We believe that this effort will allow us to increase our in-market competitiveness while tapping on green energy. Ultimately, this will lead us towards our goal of sustainable steel production. ”

-President Director of GGRP Abednedju Giovano Warani Sangkaeng (Argo).

PT Gunung Raja Paksi Tbk (GRP) is a member of Gunung Steel Group and one of the largest private steelmakers in Indonesia. This will be one the largest solar projects in Indonesia and the largest solar rooftop in the world.

By installing this solar system, GRP will reduce annual scope 2 carbon dioxide emissions and significantly reduce annual power costs. The implementation of the solar installation project will be led by the TotalEnergies ENEOS technical team, who is also responsible for design and selection of a trusted EPC partner.

Rooftop PV installation

0 years

Power purchase agreement

Specifications

MWp

System size

0 GWh / year

Renewable energy generated

Key figures

40,760 tons / year

CO2 emissions avoided
 

430,000 trees

Equivalent number planted
 

5,800 cars

Equivalent number taken off the road