PT. Perusahaan Industri Ceres​

2.2 megawatt-peak (MWp) solar rooftop system Installation

Country: Indonesia

TotalEnergies ENEOS is thrilled to support PT. Perusahaan Industri Ceres in their sustainability journey.

“We are excited to take this significant step towards a more sustainable future. Solar energy, as a renewable resource, plays an important role in reducing greenhouse gas emissions and mitigating climate change. PT. Perusahaan Industri Ceres is proud to embark on this partnership with TotalEnergies ENEOS in achieving this sustainability milestone. This also marks an advancement in Indonesia’s target of reaching net zero emissions by 2060 or sooner,” said Nancy Florencia, President Director of PT. Perusahaan Industri Ceres.

TotalEnergies ENEOS has successfully completed the installation of a 2.2 megawatt-peak (MWp) solar rooftop project with PT. Perusahaan Industri Ceres (Ceres), a leader in Indonesian chocolate confectionery products.

With over 3700 modules installed, the solar photovoltaic (PV) system generates approximately 3,250 megawatt-hours (MWh) of renewable electricity annually. The installed system will power approximately 9% of Ceres’ manufacturing facility with renewable energy in Bandung, Indonesia. The newly installed PV system will result in a reduction in the company’s overall carbon footprint by approximately 2,600 tons of CO2 emissions, equivalent to taking approximately 560 cars off the road or planting over 39,000 trees.

Rooftop PV installation​

0 years

Power purchase agreement

Specifications

MWp

System size

0 MWh / year

Renewable energy generated

Key figures

2,600 tonnes / year​

CO2 emissions avoided
 

39,000

Equivalent number planted
 

560 cars

Equivalent number taken off the road​